Gantt Alabama ZIP Codes

Gantt Alabama is covered by a total of 1 ZIP Codes. There are also 1 ZIP Codes that overlap Gantt but have a different postal city name. The ZIP Codes in Gantt range from 36038 to 36421. The total population of ZIP Codes in Gantt is 144.

Map List Related

Gantt Alabama ZIP Code Map

Click on the ZIP Codes in the interactive map to view more information. The map control in the upper right corner can be used to toggle map layers on and off. The red outline is the border of Gantt and can be turned on and off. Each type of postal code can also be turned on and off.

List of ZIP Codes in Gantt

ZIP CodeZIP Code City/TownZIP Code Type
ZIP Code 36038
GanttPO Box
ZIP Code 36421
AndalusiaStandard

Most Popular ZIP Code Searches in Alabama

2026 zipdatamaps.com